







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Brentwood
If you’re adding a second story, a room addition, or a detached ADU on a Brentwood lot, you’re working at the edge where new subdivisions meet what used to be orchards. That edge is where most of the surprises live. We know it well, from the master-planned streets off Lone Tree Way to the rural parcels east of town in 94513. Every quote we write accounts for Brentwood’s wind and storm requirements, its former-farmland soils, and the inspection steps that protect your investment later. Call (888) 276-8078 and a live person answers, day or night.
Why Groundwork Construction Co. of Vacaville Is Brentwood’s Preferred Home Additions & ADU Company

Brentwood homeowners keep coming back to us because we plan for what’s underground and overhead before we ever break ground. Our technicians have up to 12 years of experience, and they treat a Brentwood addition the way the engineering actually demands: wind-load rated connections, field-verified site drainage, and inspections signed off before rough-in gets buried. We’ve built a strong local reputation in the Brentwood area on jobs that pass the first time.
You’ll see the difference in the paperwork. Every project is backed by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s the reason people in Brentwood trust us with six-figure ADU projects. We also answer the phone. A real human picks up, 24/7, so questions during a permit review or a concrete pour delay don’t sit in a voicemail box until Monday. If you’ve had a crew disappear on you before, you know why that matters. For a deeper look at how we handle these projects across the region, see our Home Additions & ADU in Brentwood hub.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Brentwood
We run the full scope of addition and ADU work in Brentwood, from design and permitting through the final inspection. Our Home Additions & ADU team handles the following in town, and the details below are what each one looks like on a real Brentwood lot.
ADU Design & Permitting
Design starts with the site, not the floor plan. In Brentwood’s master-planned subdivisions, we field-verify grades, drainage, and utility routes before the designer draws a line, because an ADU permit set that ignores what’s buried in former orchard ground gets bounced back by the city. We handle the drawings, the structural engineering, and the permit submittal so the plans you build from actually match your property.

Garage Conversion ADU
A garage conversion is the fastest path to a rentable unit in Brentwood, and it runs $30,000 – $80,000 depending on utilities, insulation, and whether the existing slab can take the new loads. The catch on former farmland is drainage: garages built on graded orchard ground sometimes sit above unrecorded irrigation lines that move water after heavy winter rain. We check for that before we pour a new floor.

New Detached ADU
A detached ADU in Brentwood is a full small-house build, and it runs $90,000 – $220,000 depending on size, site work, and utility runs. New detached units have to meet the same wind and storm-load requirements as the tract homes around them, which means engineered tie-downs, rated framing, and concrete scheduled around the heat and rain windows. We dig exploratory test holes first, so old irrigation lines and land-leveling grades get found on our schedule, not yours.

Junior ADU & Interior Conversion
A junior ADU carved out of existing square footage is the least expensive route in Brentwood, and it works well in the late-1990s-and-newer stucco homes throughout the newer phases. We handle egress, separation, and utility rough-in so the conversion passes inspection and stays insurable. Room additions and second-story work fall under this same scope, and we’ll tell you straight which one your lot supports.
Trusted Brands We Service in Brentwood
We build to the engineer’s stamp and the city’s requirements, and we do it with materials from brand partners we trust. In kitchens and bath finishes, that includes Wellborn cabinetry and Cambria quartz, and for surface work we spec Silestone and Caesarstone where the application fits. We don’t stock inventory locally or run parts off a truck; instead we source through vetted suppliers so the rated products your plans call for actually arrive. The result is a faster turnaround and products that meet Brentwood’s wind and storm criteria instead of getting swapped for whatever was on hand.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Brentwood Homes
- No exploratory excavation on former orchard land. When a crew skips test pits, they hit old irrigation lines or an unrecorded ag-era well mid-pour and the project stops for a redesign. We budget for exploratory digging up front, so it doesn’t become a change order.
- Products that miss Brentwood’s wind-load and storm ratings. Substituting non-rated framing or hardware fails inspection sign-off, and it can sink an insurance claim later. We build to the ratings the code and engineer require, and we document it.
- Concrete and stucco pours scheduled straight through rainy season. Winter rain on a fresh structural pour compromises the work and forces rework. We schedule around the dry window and hold contingencies for the wet one.
- Tie-in details that ignore undocumented drainage. In Brentwood’s newer master-planned subdivisions the original tract homes sit on graded farmland, so foundation and drainage tie-ins need field-verified as-built conditions. That step rarely comes up on Antioch or Oakley infill lots, and skipping it is how a clean bid turns into a nightmare later.
Pricing for Home Additions & ADU in Brentwood, CA
Here’s what this work costs in Brentwood, in real numbers. A room addition typically runs $45,000 – $130,000. ADU construction runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. What moves you within those ranges is site work, utility distance, finish level, and how much exploratory digging your lot requires. We give upfront pricing with no surprises, so the number you see is the number you pay. We also offer 0% financing for 18 months and $1,000 off projects over $10,000. Call (888) 276-8078 for a free estimate.
| Project | Typical Brentwood Cost |
|---|---|
| Room Addition | $45,000 – $130,000 |
| Detached ADU Construction | $90,000 – $220,000 |
| Garage Conversion ADU | $30,000 – $80,000 |
We Also Serve Cities Near Brentwood
We work the whole East Contra Costa edge, not just Brentwood. That includes Oakley, Discovery Bay, Antioch, and Clayton, and we bring the same storm-load planning and soil checks to each of those towns. If your lot sits anywhere along that stretch of Highway 4, we can give you a straight quote on what an addition or ADU will take.
Serving Brentwood, CA – Our Local Coverage Area
We serve Brentwood and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Brentwood

Your addition or ADU has to meet the same wind and storm-load requirements as the original tract home it sits beside, and that means the design has to be engineered and stamped for your specific site, not pulled off a template. Your engineer’s stamp should reflect Brentwood’s wind requirements, and the rated framing, hardware, and tie-downs should match it on the plans. A cheap bid that skips the stamped engineering is a bid you’ll pay for at inspection. Call (888) 276-8078 for a free estimate that includes the rated specs.
Most of the time, yes. Much of Brentwood’s newer housing sits on former orchard ground that was graded and filled, and that means expansive soils and undocumented underground conditions your design has to account for. A soil study and some exploratory digging tell you what’s really under your lot before you commit to a foundation design. Skipping that step is how projects stall mid-pour when a crew hits an old irrigation line or a land-leveling grade nobody recorded. Call (888) 276-8078 to scope a free estimate that includes these checks.
Documented compliance is what an insurance carrier looks at when a claim comes in after a storm, and having it on record is what protects your payout and your premium. If your addition or ADU meets Brentwood’s wind and storm requirements with the rated products and inspection sign-offs in the file, you can show the carrier the job was built to code. A project built without that paper trail can face a denied claim. Ask for the stamped plans and inspection records. Call (888) 276-8078 for a free estimate that spells out what your compliant quote includes.
Unrecorded ag-era wells, drain tiles, and old irrigation lines. Brentwood’s master-planned communities went up over land that was farmed for decades, and a lot of what was in that ground never made it onto the subdivision maps. When you excavate for a foundation, those underground surprises can force a redesign of the foundation and utility rough-in before the first inspection. A qualified contractor budgets for exploratory digging up front so the surprise is planned, not a change order. Call (888) 276-8078 for a free estimate built around that reality.
They should schedule the concrete pours and stucco around the dry window and hold contingencies for the wet one. Brentwood summers are hot enough to affect curing, and the winter wet season can compromise a fresh structural pour if you push through it. A real schedule sequences framing and pour work into the dry months, keeps rain contingencies in the plan, and doesn’t leave you waiting when the weather turns. Call (888) 276-8078 for a free estimate and a realistic timeline for your project.
If you’re ready to price an addition or ADU on your Brentwood property, call (888) 276-8078 for a free estimate. A live person answers around the clock, our technicians are background-checked and arrive in uniform, and every project is covered by the 730-Day Done Right Promise. From foundation to finish line, we build it to last and back it in writing.
Written by the team at Groundwork Construction Co. of Vacaville.












